c.f. https://github.com/coder/coder/pull/13192#issuecomment-2097657692
We need to wait for PGCoordinator to finish its work before returning on `Close()`, so that we delete database state (best effort -- if this fails others will filter it out based on heartbeats).
Removes our pseudo rbac resources like `WorkspaceApplicationConnect` in favor of additional verbs like `ssh`. This is to make more intuitive permissions for building custom roles.
The source of truth is now `policy.go`
Just moved `rbac.Action` -> `policy.Action`. This is for the stacked PR to not have circular dependencies when doing autogen. Without this, the autogen can produce broken golang code, which prevents the autogen from compiling.
So just avoiding circular dependencies. Doing this in it's own PR to reduce LoC diffs in the primary PR, since this has 0 functional changes.
Instead of removing the mappings of unhealthy coordinators entirely,
mark them as lost instead. This prevents peers from disappearing from
other peers if a coordinator misses a heartbeat.
fixes#12923
Prevents Coordinate peer connections from generating spurious database queries like DeleteTailnetPeer when the coordinator is unhealthy.
It does this by checking the health of the querier before accepting a connection, rather than unconditionally accepting it only for it to get swatted down later.
Currently, importing `codersdk` just to interact with the API requires
importing tailscale, which causes builds to fail unless manually using
our fork.
This adds the ability for `TunnelAuth` to also authorize incoming wireguard node IPs, preventing agents from reporting anything other than their static IP generated from the agent ID.
Fixes#12141Fixes#11750
PGCoord shutdown was uncoordinated, so an update at an inopportune time during shutdown would be rejected because the coordinator row was already deleted.
This PR ensures that the PGCoord subcomponents that write updates are shut down before we take down the heartbeats, which is responsible for deleting the coordinator row.
Fixes an issue where a MultiAgentConn isn't closed properly when the coordinator it is connected to is closed.
Since servertailnet checks whether the conn is closed before reinitializing, it is important that we check this, otherwise servertailnet can get stuck if the coordinator closes (e.g. when we switch from AGPL to PGCoordinator after decoding a license).
This one is huge, and I'm sorry.
The problem is that once I change `tailnet.Conn` to start doing v2 behavior, I kind of have to change it everywhere, including in CoderSDK (CLI), the agent, wsproxy, and ServerTailnet.
There is still a bit more cleanup to do, and I need to add code so that when we lose connection to the Coordinator, we mark all peers as LOST, but that will be in a separate PR since this is big enough!
wsproxy also needs to be updated to use tailnet v2 because the `tailnet.Conn` stores peers by ID, and the peerID was not being carried by the JSON protocol. This adds a query param to the endpoint to conditionally switch to the new protocol.
Spotted during a code read. ConnIO unlocks the mutex before attempting to write to the response channel, which could allow another goroutine to call Close() and close the channel, causing a panic.
Fix is to hold the mutex. This won't cause a deadlock because the `select{}` has a `default` case, so we won't block even if the receiver isn't keeping up.
Adds support for graceful disconnect to PGCoordinator. When peers gracefully disconnect, they send a disconnect message. This triggers the peer to be disconnected from all tunneled peers.
The Multi-Agent Client supports graceful disconnect, since it is in memory and we know that when it is closed, we really mean to disconnect.
The v1 agent and client Websocket connections do not support graceful disconnect, since the v1 protocol doesn't have this feature. That means that if a v1 peer connects to a v2 peer, when the v1 peer's coordinator connection is closed, the v2 peer will
see it as "lost" since we don't know whether the v1 peer meant to disconnect, or it just lost connectivity to the coordinator.
re: #10528
Refactors PG Coordinator to work with the Tailnet v2 API, including wrappers for the existing v1 API.
The debug endpoint functions, but doesn't return sensible data, that will be in another stacked PR.
Due to a logical error in CommitQuota, all workspace Stop->Start operations
were being accepted, regardless of the Quota limit. This issue only
appeared after #9201, so this was a minor regression in main for about
3 days. This PR adds a test to make sure this kind of bug doesn't recur.
To make the new test possible, we give the echo provisioner the ability
to simulate responses to specific transitions.
* chore: add /v2 to import module path
go mod requires semantic versioning with versions greater than 1.x
This was a mechanical update by running:
```
go install github.com/marwan-at-work/mod/cmd/mod@latest
mod upgrade
```
Migrate generated files to import /v2
* Fix gen