mirror of
https://github.com/coder/coder.git
synced 2026-09-22 05:05:20 +08:00
9dcb75cd567ab910d3fc07f22af4108a435de00e
1
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
76b35edaff |
ci: backport to ESR and ESR-1 release branches (#27460)
## What Extend the backport workflow so the `backport` label fans out to **every actively supported release channel**, not just the latest three minors. Target branches are now the union of: - the latest 3 `release/2.X` branches (mainline `n`, stable `n-1`, security `n-2`), and - the active **ESR** and **maintenance ESR (ESR-1)** branches. The set is de-duplicated, so a branch that is both stable and ESR (today `release/2.34`) is backported once. Dry-run against the current branch list yields `release/2.29`, `release/2.33`, `release/2.34`, `release/2.35`. ## Why ESR / ESR-1 are designated biannually and can sit well below the top-3 window, so the previous `head -3` heuristic silently skipped them (e.g. the maintenance ESR `release/2.29`). The current ESR was only covered by coincidence when it happened to equal stable. ## Changes - Add `scripts/release_channels/esr_versions.txt` as the single source of truth for active ESR minors. - `scripts/update-release-calendar.sh` now reads that file instead of a hardcoded `ESR_VERSIONS` array (calendar output verified unchanged). - `backport.yaml` `detect` job unions the latest 3 branches with the ESR branches (existence-checked, warns and skips missing ones) and de-duplicates. - Backport PRs now get a `backport/v<version>` label, mirroring `cherry-pick.yaml`, with `issues: write` added to create the label. ### Resilience to partial failures Even with the independent matrix (`fail-fast: false`), a single branch's job could previously abort without leaving anything behind, forcing the remaining branches to be backported entirely by hand. Fixed so each branch always ends with a PR (real or placeholder): - Label, assignee, and reviewer are attached **after** the PR is created, as best-effort steps. Requesting review from / assigning the PR author is rejected by GitHub, which previously aborted `gh pr create` under `set -e` and left no PR. - Idempotency now keys off an existing backport **PR** rather than the branch, and an existing backport branch is reused instead of bailing, so a re-run recovers a branch that was pushed before its PR was opened. - The workflow now comments on the original PR with each created backport link, flagging conflicts that still need manual resolution. - Conflicting cherry-picks continue to open a placeholder PR with copy-paste resolution steps. ## Validation - `actionlint`, `shellcheck -x`, and `zizmor` all pass. - Re-ran `update-release-calendar.sh`; ESR statuses (`2.29 Extended Support Release`, `2.34 Stable (ESR)`) are identical after the refactor. - Dry-ran the detection logic against the live branch list (see set above). <details> <summary>Implementation plan</summary> # Plan: Backport to all supported release channels (mainline, stable, security, ESR, ESR-1) ## Goal The backport GitHub Action should open cherry-pick PRs against every actively supported release branch: | Channel | Meaning | Example today | |-------------------------|-----------------------------|----------------| | Mainline | last release (n) | `release/2.35` | | Stable | n-1 | `release/2.34` | | Security Support | n-2 | `release/2.33` | | ESR | current Extended Support | `release/2.34` | | Maintenance ESR (ESR-1) | previous ESR still patched | `release/2.29` | All channels map to `release/2.X` branches. ## What we targeted before `.github/workflows/backport.yaml` took the exact `release/2.X` branches, sorted by minor descending, and kept the top 3 (mainline/stable/security). ESR and ESR-1 are not derivable from version ordering, so the maintenance ESR was silently skipped. ## Source of truth for ESR branches `scripts/update-release-calendar.sh` already encoded the active ESR minors (`ESR_VERSIONS=(29 34)`), driving the release calendar. Rather than maintaining a second list, this list was extracted into a shared data file consumed by both the calendar script and the workflow. ## Changes 1. Extract the ESR minors into `scripts/release_channels/esr_versions.txt`; update `update-release-calendar.sh` to read it. 2. Extend the `detect` job to emit the union of the top-3 branches and one `release/2.<minor>` per ESR entry, existence-checked and de-duplicated. 3. Add per-release `backport/v<version>` labels (with `issues: write`), mirroring the cherry-pick workflow. ## Assumptions - Major version is always `2` (matches existing code). - The ESR list is maintained manually when ESR versions change. - `cherry-pick.yaml` stays single-branch and is out of scope. - Missing ESR branches are skipped with a warning, not a failure. </details> --- *Opened by Coder Agents on behalf of @f0ssel.* |