8 Commits
Author SHA1 Message Date
musistudio 4cba6b51a8 Apply provider capability routing per upstream attempt 2026-08-04 10:21:51 +08:00
musi 6971be8e87 Unify config storage and gateway bootstrap 2026-07-27 16:51:03 +08:00
camjac251 26d9d4cb3f test(gateway): cover delayed media listeners
Loopback listen callbacks can precede connection readiness on some hosts,
which makes otherwise deterministic media fixtures fail with refused fetches.
Reuse one TCP readiness probe before issuing requests in each affected test.
2026-07-20 14:44:42 -04:00
camjac251 809f54e3de chore: sync listener tests with main 2026-07-20 14:41:53 -04:00
musistudio 9fb8a89831 Update routing workflows and supporting configuration 2026-07-19 20:07:40 +08:00
musi 5b8f64160e Refactor router internals and update related integrations 2026-07-16 09:29:48 +08:00
camjac251 15c7254ab1 chore: sync listener readiness test with main
Upstream moved the regression into the core package and added a
loopback-bind skip. Preserve that handling while keeping the bounded
readiness probes after successful listener startup.
2026-07-15 14:58:40 -04:00
musi 2aa3529449 Refactor router internals and remove obsolete code 2026-07-15 06:39:29 +08:00