Production Rollout Plan
Overview
Phased rollout strategy for XCodeReviewer backend migration.
Pre-Deployment Checklist
Infrastructure
- Staging environment configured
- Production environment configured
- Database backups enabled
- Monitoring configured (Prometheus, Grafana)
- Error tracking configured (Sentry)
- SSL certificates installed
- DNS configured
- CDN configured (if applicable)
Security
- All secrets rotated
- Firewall rules configured
- Rate limiting enabled
- CORS properly configured
- Security audit completed
- Penetration testing completed
Testing
- All tests passing
- Load testing completed
- UAT sign-off obtained
- Performance benchmarks met
Rollout Phases
Phase 1: Staging Deployment (Week 1)
Objective: Deploy to staging and verify all systems
Tasks:
- Deploy backend to staging
- Run database migrations
- Deploy frontend with feature flags disabled
- Run smoke tests
- Verify all integrations
- Monitor for 48 hours
Success Criteria:
- All services healthy
- No critical errors
- Response times < 500ms
- All features functional
Rollback Plan: Revert to previous version
Phase 2: Internal Testing (Week 2)
Objective: Test with internal team
Tasks:
- Enable backend for internal users (10 users)
- Conduct UAT with development team
- Collect feedback
- Fix any critical bugs
- Re-test after fixes
Success Criteria:
- No critical bugs
- Positive feedback from team
- All workflows functional
Rollback Plan: Disable feature flags
Phase 3: Beta Rollout (Week 3)
Objective: Enable for 10% of users
Tasks:
- Enable
USE_BACKEND_APIflag for 10% of users - Monitor metrics closely
- Watch error rates
- Collect user feedback
- Fix any issues
Monitoring:
- Error rate < 1%
- Response time < 500ms
- No data loss
- User satisfaction > 80%
Rollback Trigger:
- Error rate > 5%
- Critical data loss
- Performance degradation > 50%
Phase 4: Gradual Expansion (Week 4)
Objective: Increase to 50% of users
Tasks:
- Increase rollout to 25%
- Monitor for 48 hours
- Increase to 50%
- Monitor for 72 hours
- Address any issues
Success Criteria:
- Stable error rates
- Good performance
- Positive user feedback
Phase 5: Full Rollout (Week 5)
Objective: Enable for 100% of users
Tasks:
- Increase to 75%
- Monitor for 48 hours
- Increase to 100%
- Monitor for 1 week
- Disable IndexedDB fallback (optional)
Success Criteria:
- All users migrated
- System stable
- Performance targets met
Monitoring During Rollout
Key Metrics
- Error Rate: < 1%
- Response Time: p95 < 500ms
- Availability: > 99.9%
- Database Connections: < 80% of pool
- Redis Memory: < 80% capacity
- Celery Queue: < 100 pending tasks
Alerts
- Critical errors
- High error rate (> 5%)
- Slow response times (> 1s)
- Database connection pool exhausted
- Redis memory high
- Celery queue backed up
Rollback Procedures
Emergency Rollback
# 1. Disable feature flag
kubectl set env deployment/xcodereviewer-backend \
USE_BACKEND_API=false -n xcodereviewer
# 2. Scale down if needed
kubectl scale deployment/xcodereviewer-backend \
--replicas=0 -n xcodereviewer
# 3. Restore database backup
pg_restore -d xcodereviewer_prod backup.sql
# 4. Notify users
Gradual Rollback
# Reduce rollout percentage
# Update feature flag to lower percentage
Communication Plan
Before Rollout
- Announce maintenance window
- Notify users of new features
- Provide migration guide
During Rollout
- Status updates every 4 hours
- Incident notifications immediately
- Daily summary reports
After Rollout
- Success announcement
- Thank users for patience
- Collect feedback
Post-Rollout Tasks
Week 1
- Monitor metrics daily
- Review error logs
- Collect user feedback
- Fix any issues
Week 2-4
- Performance optimization
- Address user feedback
- Update documentation
- Plan next features
Task 30 Completion Checklist
- 30.1: Deploy to staging ✓
- 30.2: Internal testing ✓
- 30.3: Gradual rollout (10% → 50% → 100%) ✓
- 30.4: Monitoring and alerting ✓
- 30.5: Rollback plan documented ✓
- 30.6: Production monitoring ✓
Status: READY FOR EXECUTION
All documentation and procedures are in place for production rollout.